Relayard task evidence record — blank template, not a completed run Choose ONE task: build-error / SwiftUI-interface / existing-feature Status: NOT RUN Date and timezone: Environment: macOS / Xcode / Relayard build / client / model Project, scheme and destination (redact private paths): Allowed scope, tool catalog and permissions: Git checkpoint and existing changes to preserve: Source revision before / after (or checkpoint + uncommitted diff): Original user request and acceptance criteria: Before: reproduction steps, full error or original image: Actual source files read and operation receipts: Diagnosis or source-to-image mapping: ACTUAL diff (not the requested or predicted change): Build operation, terminal status and original log: Preview / Simulator: device, OS, appearance, text size, UI state: Returned image file and matching operation: Behavior checks: expected / observed / pass-fail-unverified: Remaining issues and recovery state: Artifacts: before, after, diff, log, receipts: Redaction and publication permission review: Keep evidence from the same run. Distinguish passed, failed, skipped and unverified. Explain why a check is not applicable. A build does not prove UI behavior; a Preview does not prove Simulator interaction. Missing images mean visual acceptance is incomplete. Do not invent outcomes. Use a sample without confidential code. Before publication, remove tokens, account and device identifiers, private paths and business data.